SLD Project Process

SLD Project Process

New Project Initiation Process


An SLD Project Management Representative will be in touch via email and become the main point of contact for the remainder of the project.

SLD Submittal Process

SLD Production Process



    • Related Articles

    • HCAI Projects with SLD

      SLD is Prepared For years, SLD has coordinated projects in California that classify for HCAI level 1 and level 3 coordination, formally known as OSHPD. SLD is experienced in managing projects that encounter this additional scope of planning, and are ...
    • SLD & HEPA Filter Integration

      HEPA Filter & SLD Basics What are HEPA Filters? HEPA filters clean supplied air when controlled within HVAC ducting. HEPA filters can be used at the location of each diffuser before entering an occupied space. HEPA filters can be customized in ...
    • Receiving and Storing SLD Products

      Receive and Inspect: SLD products are double-wrapped in plastic and then boat-wrapped and palletized. SLD ships most products on open flatbed trucks. Occasionally a Conestoga trailer, hotshot team trailer, or box truck will be used depending on the ...
    • Structural Calculations

      All information contained in this Knowledge Base is provided for reference only.  SLD products are engineered to order so the detailed requirements of any particular installation will be coordinated according to the codes, requirements, and ...
    • Anchorage & Lateral Bracing

      All information contained in this Knowledge Base is provided for reference only.  SLD products are engineered to order so the detailed requirements of any particular installation will be coordinated according to the codes, requirements, and ...