Installation Contractor Training

Installation Contractor Training

AirFRAME® installation should only be completed by contractors who have been trained by SLD Technology, Inc. Since some installation characteristics can change with custom systems, a contractor training session should be booked for every installation prior to the job shipping from SLD.

Contractor training consists of a live web-based meeting. There are two options for training:
  1. The initial Installation Training takes about 1 hour to complete, includes a full walkthrough from receiving product to finishing work, review of project-specific drawings, review of the 3D model of the systems, as well as answering any questions that come up.
  2. The Refresher Training / Project Briefing takes about 30 minutes, includes a quick refresher on receiving to finishing work, review of project-specific drawings, review for the 3D model of the systems, as well as answering any questions that come up.
    1. Prerequisite: of either previous AirFRAME installation experience or previous completion of the initial Installation Training course.
Sign up here or contact support@sldus.com

Notes
Training is highly recommended but does not certify compliance with local installation licensing/union requirements.
    • Related Articles

    • Installation Manual - AirFRAME®

      NOTICE: General Reference Only The information provided in this article is for general reference purposes only and does not constitute project-specific guidance. SLD Technology products are engineered to order, and their installation must comply with ...
    • Lens Logo Installation

      NOTICE: General Reference Only The information provided in this Knowledge Base is for general reference purposes only and does not constitute project-specific guidance. SLD Technology products are engineered to order, and their installation must ...
    • Unistrut Embeds

      NOTICE: General Reference Only The information provided in this article is for general reference purposes only and does not constitute project-specific guidance. SLD Technology products are engineered to order, and their installation must comply with ...
    • Siemens Rail Install Tool

      NOTICE: General Reference Only The information provided in this Knowledge Base is for general reference purposes only and does not constitute project-specific guidance. SLD Technology products are engineered to order, and their installation must ...
    • Receiving and Storing SLD Products

      NOTICE: General Reference Only The information provided in this Knowledge Base is for general reference purposes only and does not constitute project-specific guidance. SLD Technology products are engineered to order, and their installation must ...